Natural gas turbines

How the electrons are made · 1/5

Compress

Multi-stage axial compressors squeeze air to roughly 20–40 times atmospheric pressure.

Specifications

Natural gas turbines

Open the gas turbine in 3D →

A gas turbine compresses air, burns natural gas in it and expands the hot gas through turbine blades that spin a shaft. The shaft turns a generator: a magnetic rotor inside copper coils. Combined-cycle plants recover exhaust heat to make steam and spin a second turbine. Fast to energize relative to grid upgrades, firm, but it emits.

Natural gas turbines specifications with fact status
Aeroderivative unit≈30–50 MW each (LM2500-class ≈30–35 MW)Typical
Simple-cycle efficiency≈35–42%Typical
Combined-cycle efficiency≈55–62%Typical
Capex≈$720 (CCGT) to $1,680 (engines) / kWReported
Operating cost≈$26–50 / MWh, fuel-dependentReported
Land for 100 MW≈5–10 acresReported
Turbine lead time≈2–5 years in current marketReported
Emissions≈0.35–0.55 t CO₂ per MWhTypical
  1. 01CompressMulti-stage axial compressors squeeze air to roughly 20–40 times atmospheric pressure.
  2. 02BurnNatural gas burns in the combustor at well over 1,000 °C, adding energy to the high-pressure air.
  3. 03ExpandHot gas expands through turbine stages, spinning the shaft at thousands of rpm (Brayton cycle).
  4. 04GenerateThe shaft spins a magnetized rotor inside stator windings. The changing magnetic field pushes electrons back and forth: alternating current at 60 Hz.
  5. 05Recover (combined cycle)Exhaust at ≈500–600 °C boils water in a heat-recovery steam generator; a steam turbine adds roughly half again more power.

Getting power

Connecting to the grid

Generator owns itUtility owns itCampus owns it

Step 5 of 7 · Campus

Campus substation

Two or more large power transformers, each able to carry the load alone (N+1 or 2N). Every hall gets fed from two independent sides.

Voltage
345 → 34.5 kV
Transformer size
≈100–300 MVA each
Redundancy
N+1 or 2N

Sources: Lawrence Berkeley National Laboratory, Queued Up (2024 edition); FERC Order No. 2023; Brian Potter, How to Build an AI Data Center (IFP, 2024); Crucible Capital, Building a Datacenter Part I (2025); company announcements and press reports. Figures rounded and representative.

Side by side

Comparison of power sources for a campus
SourceCapexOperating costLand per 100 MWFirm?Direct emissions
GridUtility-funded / tariffsMarket priceSubstation onlyYes, via gridRegional mix
Natural gas≈$720–1,680/kW≈$26–50/MWh≈5–10 acresYesYes (CO₂, NOx)
SMR≈$4,000–6,000/kW (est.)≈$33–45/MWh≈10–20 acresYesNone
Solar PV≈$1,530–1,790/kW≈$24–39/MWh LCOE≈500–700 acresNo, needs storageNone
Onshore wind≈$1,430–1,810/kW≈$33–46/MWh LCOE≈3,000–5,000 acresNo, needs storageNone
4-hour batteries≈$600–1,400/kW≈$104/MWh (24/7 solar case)≈1–2 acresHoursNone

Reported ranges from Crucible Capital, Building a Datacenter Part I (2025), citing EIA, NREL and industry sources. Costs move with markets; treat as indicative.